Direct Land Filling (DLF)

Direct Land Filling (DLF)

We have Secured landfill which meets criteria for hazardous waste landfill as per CPCB guidelines. The location and design of the landfill have been approved by competent authorities. Systematic operation of landfill ensures that environment around is not adversely affected. Monitoring of environment with respect to air, soil and ground water is regularly done to ensure compliances as per prescribe norms.

During the monsoon period filled up waste in the secured landfill is covered by HDPE film to protect contamination of ground water. SLF will be suitably covered as prescribed once it is filled up with waste. Prior to accept any hazardous waste Comprehensive Analysis Report (CAR) is taken from generator and for every hazardous waste consignment Finger Print Analysis is done and compared with CAR and disposal pathway is finalized. Post closure monitoring is done for all landfills.


Stay Connected!

Please let us know if you have a question, want to leave a comment.
SUBSCRIBE
contact with us